Construction Costs Estimate for Civil Works. A Model for the Analysis During the Preliminary Stage of the Project

机译:土木工程建设成本估算。项目初步阶段分析模型

获取原文

摘要

In order to estimate the cost of construction it is necessary to identify all the elements having expense and to provide the corresponding economic values accordingly to the level of detail of the project. Given the high number of variables characterizing the engineering project, it is required to have simplified schemes able to facilitate the study and management of the project. In particular, a civil work needs to have a concise representation through a suitable classification system, which allows to identify sets of homogeneous elements such that the complexity of the analysis is reduced. The classification systems commonly treated in literature are indeed based on the assumption that the building process can be broken down into simple elements able to give an efficient representation of the whole project. In the present paper, we first analyze the main classification systems of civil works, highlighting features, advantages and problems. Then, starting from the classification system proposed in Italy by the UNI 8290 regulation, which has been implemented and extended to multiple levels of detail, it is defined a Work Breakdown Structure (WBS) with the aim to be the reference for the description, the economic analysis and the management of the project already in the preliminary design stage and, later, also in its final planning stages and execution. Operationally, the decomposition of the project, aimed at identifying the processes needed to ensure the production of the work site, is the first step of the procedure, which is then followed by the quantification and the subsequent allocation of unit prices resulting from price lists. In these additional steps, we resort to semi-analytical estimation procedures, which allow us to draw up the Metric Computation (MC) and the Estimate Metric Computation (EMC) also in the preliminary design phase. The use of a simplified base model for the decomposition of the project at the stage of preliminary analysis, can improve t
机译:为了估计建设成本,有必要识别具有费用的所有要素,并根据项目的细节水平提供相应的经济价值。鉴于特征在于工程项目的大量变量,需要具有能够促进项目的研究和管理的简化计划。特别地,民用工作需要通过合适的分类系统具有简明的表示,其允许识别均匀元素组,使得分析的复杂性降低。文学中常见的分类系统确实基于假设构建过程可以分解为能够提供整个项目有效表示的简单元素。在本文中,我们首先分析了民事工程的主要分类系统,突出了特征,优势和问题。然后,从UNI 8290规则从意大利提出的分类系统开始,该规则已经实现并扩展到多个级别的细节,它定义了一个工作崩溃结构(WBS),其目的是描述的参考,经济分析与项目的管理已经在初步设计阶段,后来也在其最终规划阶段和执行情况。在操作上,该项目的分解,旨在识别确保工作现场的生产所需的流程,是程序的第一步,然后是价格清单所产生的量化和随后分配单位价格。在这些额外的步骤中,我们求助于半分析估计程序,允许我们在初步设计阶段中提取度量计算(MC)和估计度量计算(EMC)。在初步分析阶段,使用简化的基础模型用于分解项目,可以改善t

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号