首页> 外文会议>International Electrical Engineering Congress >Unit Management of a BESS-Integrated Hydro Power Plant for Spinning Reserve Enhancement
【24h】

Unit Management of a BESS-Integrated Hydro Power Plant for Spinning Reserve Enhancement

机译:用于纺纱储备增强的近集水电站的单位管理

获取原文

摘要

Owing to its fast response, the hydro power plant is normally assigned to provide spinning reserve for the power system. Despite of its large capacity, minimum generation constraint and lack of management of multi-unit generations result in limited spinning reserve. This paper solves this problem by integrating a battery energy storage system with the hydro power plant and proposes a unit management algorithm to cooperatively manage the multi-unit generation. As a result, the hydro power plant can virtually provide any demanded generation, and its spinning reserve is increased significantly compared to the traditional operation. A case study on Rajjaprabha hydro power plant in Thailand is conducted to confirm feasibility of the proposed concept.
机译:由于其快速响应,通常分配了水力发电设备以提供电力系统的纺纱储备。 尽管其容量大,但多单位代的最低发电约束和缺乏管理导致有限的纺纱储备。 本文通过将电池储能系统与水电站集成并提出了一个单位管理算法来解决这个问题,以协同管理多单元生成。 因此,水电设备实际上可以提供任何要求的一代,而其纺纱储备与传统操作相比显着增加。 进行了泰国Rajjaprabha水电厂的案例研究,以确认拟议概念的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号