首页> 外文会议>International Conference on Logistics, Informatics and Service Sciences >Risk forewarning model offreightperiod based on scenario merging
【24h】

Risk forewarning model offreightperiod based on scenario merging

机译:基于场景合并的风险预警模型offreightPeriod

获取原文

摘要

Detecting risk factors during freight period and making prevention or emergency measures is very important for reducing the probability of freight delay. In literatures, the operating time of function is considered as the fatal factor which affect freight period. More time the operation occupy, more important the function. But operating time of function can't reflect primary reason which results in freight delay. In our research, we take risk factors affecting freight period into consideration. From the perspective of transit scenario, we systematically analyze risk factors, mine the relationship among risk factors, and realize the dynamic merge of different freight scenario. This method can truly reflect fundamental factors affecting the freight period. So the management of freight period forewarning can be procedural, fine and dynamic.
机译:检测运费期间的危险因素,预防或应急措施对降低货运延迟的可能性非常重要。 在文献中,功能的操作时间被认为是影响货运期的致命因素。 更多时间操作占用,更重要的功能。 但操作时间不能反映导致货运延迟的主要原因。 在我们的研究中,我们考虑了影响货运期的风险因素。 从过境方案的角度来看,我们系统地分析风险因素,挖掘风险因素之间的关系,实现不同货运情景的动态合并。 这种方法可以真正反映影响货运期的基本因素。 因此,货运时期的管理可以是程序,精细和动态的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号