首页> 外文会议>International Conference on Power System Technology >Analysis on Fault of Yun-Guang hybrid AC/DC Power Transmission System
【24h】

Analysis on Fault of Yun-Guang hybrid AC/DC Power Transmission System

机译:云广混合交流电力传输系统故障分析

获取原文
获取外文期刊封面目录资料

摘要

This paper addresses the transient response of instant ground fault in Yun-Guang hybrid UHVDC/AC power transmission system. A detailed bipolar UHVDC electromagnetic transient model is established by PSCAD/EMTDC software. The control strategies for UHVDC system are investigated and the main factors of commutation failure are analyzed. A lot of simulation results demonstrate that Yunnan rectifier AC system fault can not cause UHVDC commutation failure. Metallic ground fault of Guangdong inverter AC system will result in UHVDC commutation failure but enough transition resistance can reduce the chance of it. When one pole ground fault of UHVDC line occurs, DC current of the fault pole has an obvious overshoot and non-fault pole is influenced a little. UHVDC can come back to normal operation once the instant ground fault is cleared.
机译:本文介绍了云广混合型UHVDC /交流电力传输系统瞬态接地故障的瞬态响应。 PSCAD / EMTDC软件建立了详细的双极UHVDC电磁瞬态模型。研究了UHVDC系统的控制策略,分析了换向期的主要因素。很多仿真结果表明,云南整流器交流系统故障不能导致UHVDC换向故障。广东逆变器AC系统的金属接地故障将导致UHVDC换向故障,但足够的过渡阻力可以减少它的可能性。当发生UHVDC线路的一个磁极接地故障时,故障极的直流电流具有明显的过冲,非故障极受到一点。一旦清除即时接地故障,UHVDC可以恢复正常操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号