“Virtual” power line method to correct the calculation of current ground faults in the parallel overhead transmission lines 110–220 kV

机译:“虚拟”电源线方法,以校正并行架空传输线路110-220 kV的电流接地故障计算

获取原文

摘要

The mutual induction between the phase wires of the different overhead power lines located close to each other causes unbalanced redistribution of currents in the line wires. This leads to emergence of the out-of-balance zero sequence current, which affects negatively on the sensitivity of the zero-sequence current protection. It is impossible to estimate such out-of-balance current by the means of typical calculation programs for short circuit currents. This paper describes the method of “virtual” lines for an extra correction of the values of zero-sequence currents during the 110-220 kV current ground faults occurring in the overhead power lines. There is an example of using this method for three 220 kV parallel overhead lines passing close to each other.
机译:位于彼此靠近的不同桥接电源线的相线之间的互感导致线线中的电流的不平衡再分布。这导致出现超零序序电流,这对零序电流保护的灵敏度产生负面影响。通过用于短路电流的典型计算程序的手段,不可能估计这种失衡的电流。本文介绍了在开销电源线中发生的110-220 kV电流接地故障期间额外校正零序电流值的“虚拟”线路的方法。有一个例子是使用这种方法对于三个220 kV并联架空线,彼此接近。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号