首页> 外文会议>AACE International conference expo >The Why, When, and How of a Productivity Claim
【24h】

The Why, When, and How of a Productivity Claim

机译:生产力索赔的原因,何时以及如何索赔

获取原文

摘要

One of the most contested and controversial issues that often arises in construction claims is the calculation and/or estimation of lost productivity on a construction project. Contractors prefer to use estimation methods while owners often insist on using actual cost data, which in many cases does not exist. Tracking efficiencies and productivity on any project is often overlooked, but it can greatly affect the value of a loss of productivity claim if done correctly or incorrectly when pursuing a change orders or claims. This article will present the common pitfalls of typical loss of productivity claims based on measured mile analyses and industry studies, as well as, lessons learned and observations from actual construction claims. The article will also examine the pitfalls, why they occur, and how to avoid them in preparing a claim.
机译:建设声明中经常出现的最有争议和争议的问题之一是计算和/或估算建筑项目的生产力。承包商更愿意使用估计方法,而业主通常要使用实际成本数据,则在许多情况下不存在。跟踪任何项目的效率和生产率通常被忽视,但如果在追求更改订单或索赔时,可以大大影响生产率索赔的损失的价值。本文将基于测量的英里分析和行业研究,以及从实际施工索赔的经验教训和观察的教训,本文提出了典型生产力索赔的常见缺陷。这篇文章还将检查陷阱,为什么他们发生,以及如何避免他们准备索赔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号