Taming the Multi-Stakeholder Hydra: A case study in planning, permitting, design and construction of a gravity sewer meeting Federal, State, and Private Stakeholder constraints.

机译:驯服多利益相关者HYDRA:在会议联邦,州和私有利益相关者限制的重力下水道规划,允许,设计和建设的案例研究。

获取原文

摘要

This case study will discuss the intricacies in planning, designing, permitting and constructing a large-scale gravity sewer project for Loudoun Water in Loudoun County, VA. Located just west of Washington DC and currently one of the fastest growing areas in the country, Loudoun Water requires this new sewer to meet projected wastewater demands in their Horsepen Run sewershed. The 20,000 linear-foot pipeline of large diameter sewer (72/48/42 inch) crossed only four properties, but affected numerous stakeholders. A large portion of the project crossed the Washington Dulles International Airport, and also required extensive work under and around the new Metro Rail Silver Line. Stakeholders - each with unique and challenging requirements - included the following: 1. Metropolitan Washington Airports Authority (MWAA) 1.1 Federal NEPA applicability/constraints 1.2 Phase I Archaeological Survey 1.3 Specific Federal Aviation Administration blasting requirements 2. Capital Rail Constructors (CRC) (Metrorail Silver Line Phase 2 Design-Build Team) 2.1 Construction work area access 2.2 Coordination of design 2.3 Coordination of schedules 3. Washington Metropolitan Area Transit Authority (WMATA) 3.1 Coordination with ongoing construction project including buried infrastructure 4. Toll Road Investors Partnership Ⅱ (TRIP Ⅱ) - owner of the Dulles Greenway 4.1 Limited Access Highway Break to facilitate maintenance and construction 4.2 Multiple tunnel crossings under roadway and ramps 4.3 Required road closures as a result of blasting operations 5. Virginia Department of Transportation (VDOT) 5.1 Coordination of Horsepen Pond Emergency Spillway and Old Ox Road Widening Project 5.2 Multiple tunnel crossings under roadway and ramps 6. Dulles World Center (DWC a large private development) 6.1 Coordinate future sewer connections and avoidance of tree conservation areas 6.2 Coordination with ongoing construction activities 7. DC Water and Sewer Authority (DC WAS A) 7.1 Coordination for crossings of the Potomac Interceptor (PI), Indian Creek Sewer, and adjacent construction 7.2 Blasting and construction traffic concerns around existing Potomac Interceptor 8. Fairfax County 8.1 Provide capacity for future Fairfax wastewater flows 8.2 Facilitate division of Loudoun Water and Fairfax flow from an existing shared sewer via a flow splitter box and meter vault Timing for the project was driven by anticipated increased demands as well as a desire to design and construct the new sewer prior to construction of WMATA's new Metrorail Silver Line Phase 2, which had to be crossed in four locations. The Owner wanted to avoid conflicts during construction, reduce installation risks in the vicinity of an active light rail line, and avoid having to obtain approval from two federal authorities - MWAA and WMATA. An important nuance of the project is that MWAA is the Owner of the Metrorail Silver Line Project until its construction is complete. The initial concept was to design the project to approximately the 60% design level and install casing pipes to facilitate future installation of the sewer without encroaching into WMATA's easement. Through stakeholder meetings with MWAA it was learned installation of the casing pipes would 1) not preclude the need for future approvals from WMATA, and 2) the necessary easement could not be obtained without a full Phase 1 archaeological survey, 401/404 permit, and encroachment agreements from VDOT, and the Dulles Greenway (TRIP Ⅱ) for the entire pipeline length. Consequently, the design was modified to a 100% design in time to still meet the Owner's initial goal of installing its sewer project before the construction of the Silver Line. The presentation will outline the strategies implemented by the Project team to engage stakeholders and facilitate and expedite their review and approval. In addition to the early coordination with MWAA, there were varying levels of coordination required with each of the major stakeholders for vari
机译:这种情况研究将讨论劳顿县劳顿县讲伙伴水的规划,设计,允许和构建大型重力下水道项目的复杂性。位于华盛顿特区的西部,目前在该国增长最快的地区之一,讲座之一需要这个新的下水道,以满足他们的马翼跑步下水道的预计废水需求。大直径下水道(72/48/42英寸)的20,000脚管线仅交叉四个属性,而是影响了许多利益相关者。该项目的一大部分越过华盛顿杜勒斯国际机场,还需要在新的地铁铁路线下面和周围的广泛工作。利益相关者 - 每个都有独特和具有挑战性的要求 - 包括以下内容:1。大都会华盛顿机场权威(MWAA)1.1联邦NEPA适用性/约束1.2阶段I考古调查1.3特定联邦航空管理爆破要求2.资金轨结构师(CRC)(CRC)(CRC)(CRC)(CRC)(Metrorail)银线第2阶段设计 - 建设团队)2.1施工工作区Access 2.2设计的协调2.3时刻表的协调3.华盛顿大都市区交通管理局(WMATA)3.1与正在进行的建筑项目的协调,包括埋设基础设施4.收费路投资者合作伙伴关系Ⅱ(旅行Ⅱ) - 杜勒斯绿道的所有者4.1有限的访问公路休息,促进维护和建设4.2巷道下的多个隧道交叉口4.3爆破业务的必要道路封闭件5.弗吉尼亚州的交通系(VDOT)5.1马翼池塘紧急溢洪道和旧牛路扩大的proj ECT 5.2巷道下的多个隧道交叉口6.杜勒斯世界中心(DWC大型私人开发)6.1协调未来的下水道连接和避免树木保护区6.2与正在进行的建筑活动的协调7.直流水和下水道权威(DC是A) 7.1对波托马克拦截器(PI)的交叉口的协调,印度溪下水道和邻近的建设7.2爆破和施工交通涉及现有波托马克拦截器8. Fairfax County 8.1为未来的Fairfax废水流量提供8.2促进劳动力水和Fairfax流程的能力从现有的共用下水道通过流量分配器盒和项目的仪表Vault时序由预期增加的需求驱动,并且在建造WMATA的新的Metrorail Silver Lime 2之前设计和构建新下水道的愿望在四个地点交叉。业主希望避免在施工期间避免冲突,减少有源轻轨线附近的安装风险,并避免必须获得两名联邦当局的批准 - MWAA和WMATA。该项目的重要细节是MWAA是Metrorail Silver Line项目的所有者,直到其施工完成。最初的概念是将该项目设计为大约60%的设计水平,并安装套管管道以促进下水道的未来安装,而不会侵入WMATA的eAtement。通过利益相关方会议与MWAA进行了学习的套管管道的安装1)并不排除从WMATA的未来批准的需求,2)未经全期141/404允许的情况下无法获得必要的地役权。从VDOT的侵占协议,以及整个管道长度的杜拉斯绿道(TrawⅡ)。因此,该设计被修改为100%的设计时,仍然满足所有者在银线建造之前安装其下水道项目的初始目标。该演讲将概述项目团队实施的战略,以吸引利益攸关方,促进和加快审核和批准。除了与MWAA的早期协调外,还有各大利益相关者需要不同程度的vari

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号