The City of Richmond, Virginia, is faced with a unique challenge of determining a permanent solution to address structurally damaged portions of Chimborazo Interceptor Sewer residing within and near a steep hillside that is prone to failure. Located adjacent to Chimborazo National Park, an unconventional design approach had to be developed to abandon the original brick step combined sewer. This paper will highlight the field investigation work, flow monitoring, hydraulic modeling and analysis, equipment evaluation, and coordination efforts that went into the proposed design of this replacement sewer. The design for Phase 1 is complete and is anticipated to bid fall 2018. It features a flow diversion chamber to separate dry and wet weather flows, a 100-foot drop shaft with two vortex flow insert units, and 800-feet of 60-inch sewer replacement. The paper also discusses recommended Phase 2 work, which includes sewer repair and realignment downstream of Chimborazo Hill.
机译:弗吉尼亚里奇蒙德市面临着决定永久解决方案,以解决居住在俯瞰失效的陡峭山坡内和附近的Chimborazo拦截器下水道的结构损坏部分的独特挑战。位于滨伯罗萨国家公园附近,必须开发一种非常规设计方法来放弃原始砖上的下水道。本文将突出现场调查工作,流量监测,液压建模和分析,设备评估,以及进入该更换下水道的建议设计的协调努力。第1阶段的设计是完整的,预计将预计2018年秋季。它具有流动转移室,以分离干燥和潮湿的天气流动,一个100英尺的落叶,带有两个涡流流插件单元,800英尺的60英寸下水道更换。本文还讨论了建议的2阶段工作,包括下水道修复和赤博山山下游的重新调整。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号