A SIMULATION-BASED FRAMEWORK FOR QUANTIFYING THE COLD REGIONS WEATHER IMPACTS ON CONSTRUCTION SCHEDULES

机译:一种基于模拟的框架,用于量化寒冷地区天气影响施工时间表

获取原文

摘要

In cold regions, weather severity has a major impact on construction activities carried out in the open, leading to significant deviations from baseline schedules. Faced with weather uncertainty, setting up the project baseline schedule, against which performance will be measured, can be challenging. Construction planners often depend on their personal judgment and experience to account for the scheduling impact of cold weather. Due to variation in planners' experiences, the regions where their experience was acquired, and the time of year when the planned project is to be executed, the result can be widely differing plans between planners. This paper presents a structured simulation-based approach that attempts to account for the cold weather impacts on project schedule. This approach relies on generating weather sequences similar to the existing historical weather data for the project's geographical region. The impact on productivity and project schedule can then be modeled, leading to consistent schedules.
机译:在寒冷地区,天气严重程度对开放开放开展的建筑活动产生了重大影响,导致与基线时间表的显着偏差。面对天气不确定性,建立项目基线时间表,将衡量哪些性能,可能是具有挑战性的。建筑规划人员往往取决于他们的个人判断和经验,以考虑寒冷天气的调度影响。由于规划人员的经验变化,所以收购经验的地区,以及执行计划项目的一年时间,结果可以在规划者之间广泛不同。本文提出了一种基于结构化的模拟方法,试图考虑对项目时间表的寒冷天气影响。这种方法依赖于生成类似于项目地理区域的现有历史天气数据的天气序列。然后可以建模对生产率和项目时间表的影响,从而导致一致的时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号