首页> 外文会议>Waste Management Symposium >PLANNING AND IMPLEMENTATION OF THE RETRIEVAL OF BURIED TRANSURANIC WASTE AT OAK RIDGE NATIONAL LABORATORY*
【24h】

PLANNING AND IMPLEMENTATION OF THE RETRIEVAL OF BURIED TRANSURANIC WASTE AT OAK RIDGE NATIONAL LABORATORY*

机译:橡木岭国家实验室埋藏经阵亚废物检索的规划与实施*

获取原文

摘要

As part of the U.S. Department of Energy’s (DOE’s) Accelerated Closure at Oak Ridge National Laboratory (ORNL), Bechtel Jacobs Company LLC (BJC) is remediating Solid Waste Storage Area (SWSA) 5 North. Remote-handled (RH) alpha-contaminated transuranic (TRU) waste was placed into 22 unlined trenches in SWSA 5 North between 1971 and 1981. The majority of the TRU waste was packaged in 204 concrete casks having one of several configurations. However, a number of the 22 trenches contain waste packaged in wooden boxes, metal boxes, and metal drums. At least two trenches are documented to contain loose materials placed into the trench with no indication of original packaging. One trench contains mixed Resource Conservation and Recovery Act (RCRA) waste. The various containers and loose waste will be retrieved from the trenches, overpacked, and staged, pending treatment and final disposition. Initially, available information on the 22 trenches was integrated into requirements from the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) and a consent agreement between DOE and the Tennessee Department of Environment and Conservation (TDEC) to develop the basis for a scope of work. A part of the scope, BJC’s remediation subcontractor was responsible for preparation of work control and safety basis documentation appropriate for conducting this work in a DOE Nuclear Facility. The TRU Waste Retrieval Project is being implemented in a phased manner, allowing low-risk preliminary work to be completed in parallel with the preparation and implementation of controls that will govern the higher risk retrieval and overpacking activities. This phased approach was used in developing work plans for specific tasks, with initial mobilization and site preparation activities being implemented while the documentation for subsequent tasks was being developed and approved. This approach contributes to the accelerated closure schedule, while allowing the project team to gain experience working together in a controlled environment and also incorporate information and lessons learned during early stages into subsequent project activities. The primary focus of this paper is on the planning and implementation of methods and controls that allow effective and efficient project execution while minimizing risks to the workers, public, and the environment. Waste retrieval will be performed inside a retrieval enclosure using commercial construction equipment adapted for the unique needs of the project. The retrieved waste will be packaged into steel overpacks and staged on site in preparation for processing and final disposal.
机译:作为美国能源部(DOE)的一部分,加速了橡树岭国家实验室(ORNL)的关闭,Bechtel Jacobs Company LLC(BJC)正在修复固体废物储存区(SWSA)5北。在1971年至1981年间,将远程处理(RH)α-污染的经阵容(TRU)废物置于SWSA 5 North的22个无衬段中。大多数Tru废物在204个混凝土桶中包装,其中包括几种配置之一。然而,许多22个沟槽含有在木箱,金属盒和金属鼓中包装的废物。记录至少两个沟槽以含有放置在沟槽中的松散材料,没有标准包装的指示。一个沟槽包含混合资源保护和恢复法案(RCRA)浪费。各种容器和松散的废物将从沟渠中取出,过包装和分阶段,待处理和最终处置。最初,关于22个沟槽的可用信息纳入了从综合环境响应,赔偿和责任法案(CERCLA)决定(ROD)记录的要求,以及DOE与田纳西州环境和保护部(TDEC)之间的同意协议。制定工作范围的基础。该范围的一部分,BJC的补救分包商负责准备适合于在DOE核设施中进行这项工作的工作控制和安全基础文件。在TRU废物检索项目是分阶段进行实施,使低风险的前期工作,与那将决定风险较高的检索和过度填充活动控制编制和实施并行完成。这种分阶段方法用于制定特定任务的工作计划,初步动员和现场准备活动,而在制定并批准后续任务的文件的情况下正在实施。这种方法有助于加快闭幕时间表,同时允许项目团队获得在受控环境中共同努力的经验,并将早期阶段中学到的信息和经验教训纳入随后的项目活动。本文的主要焦点是规划和实施方法和控制,允许有效和有效的项目执行,同时最大限度地降低工人,公众和环境的风险。使用适用于项目独特需求的商业施工设备,将在检索外壳内进行废物检索。检索到的废物将被包装成钢包装并在现场上演,以准备加工和最终处置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号