首页> 外文会议>Association of State Dam Safety Officials Annual Conference >How many challenges can one dam have?? And you want the repairs made in how many days?? Designing and Constructing Risk Reduction Measures at Beaver Park Dam
【24h】

How many challenges can one dam have?? And you want the repairs made in how many days?? Designing and Constructing Risk Reduction Measures at Beaver Park Dam

机译:一个大坝有多少挑战?而且你想要修理多少天? Beaver Park Dam的设计与构建风险降低措施

获取原文

摘要

The Colorado State Engineer's Office (SEO) restricted the reservoir level at the 100-year old Large, High Hazard Beaver Park Dam in spring 2010 based on a 'sinkhole' found on the left abutment. After the restriction, Colorado Parks and Wildlife (CPW) commissioned a quantitative risk analysis to identify the primary dam safety risk-driving potential failure modes (PFMs). This paper addresses the key challenges encountered during design and construction of safety upgrades and how those challenges were successfully overcome to mitigate the key risks and to implement other important dam safety and operational upgrades. Among the many challenges faced were a forest fire, access to and construction on extremely steep and unstable natural terrain, limited documentation on some key project features, prior improvements having obscured some of those key features, weather at 8,800 feet in the San Juan Mountains, and the need to divert flows from the large watershed above the dam.
机译:科罗拉多州工程师的办公室(SEO)限制了100岁的大型高危险海狸公园大坝的水库水平,基于左基台上的“污水”。在限制后,科罗拉多州公园和野生动物(CPW)委托了定量风险分析,以确定主要大坝安全风险驾驶潜在失效模式(PFMS)。本文解决了安全升级设计和构建期间遇到的关键挑战以及如何成功地克服这些挑战,以减轻关键风险,并实施其他重要的大坝安全和运营升级。在许多面临的挑战中是森林火灾,对极端陡峭和不稳定的自然地形的进入和建设,有限的关于一些关键项目特征的文件,在遮蔽了一些关键特征,在圣胡安山区的8,800英尺的天气下,有限的改进,并且需要从大坝上方的大流域转移流动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号