The Maline Creek Tunnel (MCT) will be the first large diameter chamber to store combined sewer overflows in St. Louis. The MCT is a key feature of Project Clear, Metropolitan St. Louis Sewer District's (MSD) Long Term Control Plan to address sanitary and combined sewer overflows to local streams and rivers. Project Clear's estimated cost is greater than $4 Billion dollars making it the largest public works project to date for the state of Missouri. The MCT includes the construction of a 40-ft diameter, 12.5 MGD submersible pump station, a 28-ft diameter x 2,700-ft long cavern, a 580-ft long x 6-ft lined connecting tunnel, three deaeration chambers, three intake structures, a shallow connector sewer constructed by microtunneling, and 1,000 feet of 12-inch to 30-inch diameter near surface sewers. Bids were opened on March 10, 2016. The successful bidder was SAK/Goodwin JV with a bid of $82.3 M dollars. The Engineer's Estimate was $87.7 M dollars. The project was awarded in May 2016. The contractor mobilized on site in June 2016. The project is allocated 1567 calendar days to complete the construction.
机译:Maline Creek隧道(MCT)将是第一大直径腔室,用于将合并的下水道溢出在圣路易斯溢出。 MCT是项目清晰的一个关键特征,大都会圣路易斯下水道区(MSD)长期控制计划解决卫生和合并的下水道溢出到当地的溪流和河流。项目明确的估计成本大于40亿美元,使其最大的公共工程项目迄今为止迄今为止。 MCT包括施工40英尺直径,12.5 MgD潜水泵站,28英尺直径x 2,700英尺长的洞穴,一个580-ft长x 6-ft衬里连接隧道,三个脱气室,三个进气结构,由Microtunneling构造的浅连接器下水道,在表面下水道附近1000英寸至30英寸直径。投标于2016年3月10日开业。成功的投标人是SAK / Goodwin JV,投标价格为82.3米。工程师的估计值为87.7米。该项目于2016年5月颁发。承包商于2016年6月在现场调动。该项目被分配了1567个日历日才能完成建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号