首页> 外文会议>Rapid Excavation and Tunneling Conference >Third Street Light Rail Phase 2, Central Subway Stations, San Francisco, CA-Utilization of Multiple Foundation Techniques
【24h】

Third Street Light Rail Phase 2, Central Subway Stations, San Francisco, CA-Utilization of Multiple Foundation Techniques

机译:第三街轻轨阶段2,中央地铁站,旧金山,加入多基础技术的利用

获取原文

摘要

In October 2013, Bencor Global (a Keller Company) was awarded a subcontract by the successful prime contractor, Tutor-Perini Corporation, to perform key elements of the construction of the support of excavation system to facilitate the installation of underground subway stations for the project owned by the San Francisco Municipal Transportation Agency. The Central Subway (Contract 1300) is the second phase of San Francisco's Third Street Light Rail Program. It is a 2.74 kilometer extension that will expand light rail service within the city, improve regional connections to Caltrain, BART, Muni Metro, and provide an alternate transportation option to congested vehicular surface traffic.The key elements of this project included the utilization of three different advanced foundation techniques using diaphragm walls, compensation grouting and jet grouting at the new Chinatown Station (CTS), Yerba Buena/Moscone (YBM) and the Union Market Street Station (UMS). This paper will discuss the complexities associated with the planning and performance of geotechnical construction work in the heart of downtown San Francisco within densely populated neighborhoods and complex underground utility systems. It will also highlight the logistics associated with coordinating key elements of a complex foundation system and the benefits of utilizing one geotechnical contractor to perform all three elements on the project.
机译:2013年10月,Bencor Global(一家Keller公司)被成功的主要承包商导师 - Perini Corporation颁发了一项分包,以执行挖掘系统支持建设的关键要素,以促进该项目的地下地铁站的安装由旧金山市政运输机构拥有。中央地铁(合同1300)是旧金山第三街轻轨计划的第二阶段。它是一个2.74公里的延伸,将在城市内扩大轻轨服务,改善与Caltrain,Bart,Muni Metro的区域连接,并为拥挤的车辆表面流量提供备用交通选择。该项目的关键要素包括三个新的唐人街站(CTS),Yerba Buena / Moscone(YBM)和Union Market Street Station(UMS),不同的先进基础技术,在新的唐人街站(CTS),Yerba Buena / Moscone(YBM)和Union Market街站(UMS)。本文将讨论与旧金山市中心的岩土工程工作规划和性能相关的复杂性,始致填充的社区和复杂的地下实用系统。它还突出了与复杂基础系统的协调关键要素相关的物流以及利用一个岩土工业承包商在项目上执行所有三个要素的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号