首页> 外文期刊>Tramways & Urban Transit >New study for San Francisco Central Subway
【24h】

New study for San Francisco Central Subway

机译:旧金山中央地铁的新研究

获取原文
获取原文并翻译 | 示例
       

摘要

Caltrans has awarded nearly USD82m towards the Muni Central Subway LRT line in San Francisco. The 2.7km (1.7-mile) addition to Muni's T Third line will run from the Caltrain commuter rail depot at 4th and King Streets to Chinatown, and is anticipated to cater for 42 400 passengers/day by 2030. Voters authorised the funding through Proposition 1B, a 2006 bond measure that ringfenced USD19.9bn for over 1000 transit projects across California. Meanwhile, a study released by the San Francisco Municipal Transportation Agency and the San Francisco Transportation Authority has suggested that extending the Central Subway to the north-eastern waterfront could attract an extra 40 000 passengers per day - and compete well for federal funding on initial cost/benefit analyses.
机译:Caltrans已向旧金山的Muni Central Subway LRT线路拨款近8,200万美元。 Muni的T Third线全长2.7公里(1.7英里),将从第4街和King街的Caltrain通勤铁路仓库到唐人街,预计到2030年将满足每天42400名乘客。选民通过Proposition授权了这笔资金1B是2006年的一项债券措施,为整个加利福尼亚州的1000多个公交项目提供了199亿美元的担保。同时,旧金山市交通局和旧金山市交通管理局发布的一项研究表明,将中央地铁延伸至东北滨水区每天可吸引额外4万名乘客-并能在初期成本上与联邦资金竞争良好/效益分析。

著录项

  • 来源
    《Tramways & Urban Transit》 |2015年第925期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号