首页> 外文会议>Rapid Excavation and Tunneling Conference >EVALUATION OF GEOLOGICAL CONDITIONS AHEAD OF TBM USING SEISMIC REFLECTOR TRACING AND TBM DRIVING DATA
【24h】

EVALUATION OF GEOLOGICAL CONDITIONS AHEAD OF TBM USING SEISMIC REFLECTOR TRACING AND TBM DRIVING DATA

机译:利用地震反射追踪和TBM驾驶数据评估TBM前面的地质条件

获取原文

摘要

For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was developed for better prediction of geological conditions ahead of the tunnel face during excavation. The seismic reflector tracing produces volumetric images of anomalies in the ground in "near-real time." These images are verified using logging data from pilot boring and TBM driving data, to improve reliability and precision of ground mapping. Also good correlation was obtained between the rock strength index computed from TBM data, and one derived from volumetric seismic images.
机译:对于TBM隧道,不可能对挖掘接地进行目视检查。这可能阻碍高速挖掘,特别是在复杂的地面条件下。开发了TBM挖掘控制系统,以便在挖掘过程中更好地预测隧道面的地质条件。地震反射器跟踪在“近实时”中产生了地面的异常体积图像。使用来自导频镗孔和TBM驱动数据的测井数据进行验证这些图像,以提高地面映射的可靠性和精度。在从TBM数据计算的岩石强度指数之间获得了良好的相关性,并且从容积地震图像中导出的岩石强度指数之间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号