首页> 外文会议>Rapid Excavation and Tunneling Conference >LOS ANGELES METRO GOLD LINE EASTSIDE EXTENSION-TUNNEL CONSTRUCTION CASE HISTORY
【24h】

LOS ANGELES METRO GOLD LINE EASTSIDE EXTENSION-TUNNEL CONSTRUCTION CASE HISTORY

机译:洛杉矶地铁金线Estside延伸隧道施工案例历史

获取原文

摘要

This paper reflects the challenges encountered during the construction of the light rail tunnels under Boyle Heights, in Los Angeles, California. Equipped with two state-of-the-art EPB TBMs, the construction team undertook the mining of twin bored tunnels in the Los Angeles alluvium. The gassy underground conditions dictated many aspects of the design of the tunnels, as well as the tools and means used for their construction. This paper will detail the challenges encountered during construction, as well as the means, methods and logistics used on the project. Discussion includes: EPB TBM machines with some very unique/specific features; complex assembly sequence due to limited shaft access; final precast concrete liner with double gaskets; NATM cross passage excavation in soft ground and below the water table; compensation grouting; mucking shaft arrangement.
机译:本文反映了在加利福尼亚州洛杉矶的博伊尔高地建造轻轨隧道期间遇到的挑战。建筑队在洛杉矶加剧中开采了两头最先进的EPB TBMS,在洛杉矶举行的钻孔隧道采矿。 Gassy地下条件决定了隧道设计的许多方面,以及用于其建筑的工具和手段。本文将详细介绍施工期间遇到的挑战,以及项目上使用的手段,方法和物流。讨论包括:EPB TBM机器,具有一些非常独特/特定的功能;复杂的装配序列由于有限的轴进入;最终预制混凝土衬垫,双垫圈; Natm交叉通道挖掘在软土地板和水上台下方;补偿灌浆;擦拭轴布置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号