首页> 外文会议>Rapid Excavation and Tunneling Conference >THE LAKE MEAD INTAKE 3 WATER TUNNEL AND PUMPING STATION, LAS VEGAS, NEVADA, USA
【24h】

THE LAKE MEAD INTAKE 3 WATER TUNNEL AND PUMPING STATION, LAS VEGAS, NEVADA, USA

机译:米德摄入3水隧道和泵站,拉斯维加斯,内华达州,美国

获取原文

摘要

The Southern Nevada Water Authority (SNWA) operates two water-intakes in Lake Mead, located 20 miles east of Las Vegas, Nevada. Severe drought has caused decline in lake level by 85 feet since 2000 and future declines are expected. SNWA will construct a third deep-water intake to ensure existing water system capacity. This paper describes expected construction challenges for the new project that consists of: an intake structure and tunnel beneath the lake, pumping station, pipeline to connect existing treatment facility, and interconnecting underground adits. The project will be completed in the year 2012 for total estimated cost of approximately 600 million dollars.
机译:南内华达州水当局(SNWA)在米德尔湖,位于内华达州拉斯维加斯以东20英里的地区,运营了两次水摄入口。自2000年以来,严重的干旱引起了85英尺的湖泊水平下降,预计未来的下降将是预期的。 SNWA将建设第三次深水摄入量,以确保现有的水系统能力。本文介绍了包括:湖泊,泵站,管道下方的进气结构和隧道,以连接现有的处理设施,以及互连地下配方的进气结构和隧道。该项目将于2012年完成,总估计成本约为6亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号