Shallow SEM Tunneling with Limited Clearance to Existing Structures: Design, Construction and Observations

机译:浅SEM隧穿,现有结构间隙有限:设计,建设和观察

获取原文

摘要

The excavation and initial lining has just been successfully completed for the Downtown Bellevue Tunnel using Sequential Excavation Methods (SEM). The soft ground tunnel, approximately 2,000 feet long and 38 feet wide with very shallow cover, faced several unique challenges and design refinements that were managed and implemented during final design and construction. This paper provides an overview of the tunnel construction, then focuses on three design refinements; tunneling under an existing utility trench with 4 feet of vertical clearance, tunneling within 4 feet of an existing building basement, and eliminating pipe canopy and replacing 12-foot thick overburden soil with controlled low strength material (CLSM) at the tunnel's north portal. Details of the analysis, design, and construction of these design refinements, together with the comparisons between the predicted and observed settlement results are presented.
机译:使用连续的挖掘方法(SEM),挖掘和初始衬里刚刚成功完成了市中心的Bellevue隧道。柔软的地面隧道,大约2,000英尺长38英尺,宽38英尺,面向最终设计和施工期间管理和实施的几种独特的挑战和设计改进。本文概述了隧道施工,然后专注于三种设计改进;在现有的公用事业沟下隧道隧道,垂直间隙4英尺,在现有建筑地下室的4英尺范围内,并在隧道的北门户中消除了管冠层,用控制的低强度材料(CLSM)更换12英尺厚的覆盖度土壤。这些设计改进的分析,设计和构造的细节,以及预测和观察结果之间的比较以及呈现的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号