John Hart Generating Station Replacement Project-Underground Works: Project Update and Challenges Encountered

机译:John Hart发电站更换项目地下工程:项目更新和挑战遇到

获取原文

摘要

The Frontier-Kemper/ASL Joint Venture was formed to excavate the underground workings of the John Hart Generating Station Replacement Project in Campbell River, British Columbia. The existing surface 126-MW John Hart Generating Station originally completed in 1947 on the Campbell River, represents approximately 17% of the total generating capacity on Vancouver Island. The underground replacement project will create a more reliable, seismically robust, and environmentally friendly facility with an increased installed capacity of 132 MW. InPower BC General Partnership is a special-purpose vehicle created by SNC-Lavalin Capital Inc., and contracted by British Columbia Hydro and Power Authority (BCH) to design, build, finance and maintain the replacement power station under a 19 % year public-private partnership (PPP) with BCH. The underground excavation works portion of the project is 77% complete as of the end of November 2016 and is scheduled to achieve substantial completion on or ahead of schedule by July 2017.
机译:Frontier-Kemper / ASL合资企业成立,以挖掘不列颠哥伦比亚省坎贝尔河坎贝尔河的John Hart发电站更换项目的地下运作。现有的126-MW John Hart发电站最初于1947年在坎贝尔河上完成,代表了温哥华岛上总产生容量的约17%。地下替代项目将创造更可靠,地震稳健,环保的设施,增加了132兆瓦的装机容量增加。 INPOWER BC普通伙伴关系是由SNC-LAVALIN CAPITE INC的专用车辆,并由不列颠哥伦比亚省水电和权力管理局(BCH)签约,以在19%的公共期间设计,建造,融资和维护更换电站 - 私人伙伴关系(PPP)与BCH。截至2016年11月底,该项目的地下挖掘工程部分齐全为77%,并计划于2017年7月在附表中实现实质性完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号