Gas inflows into Cleveland, Ohio tunnels are well-documented and historically addressed with ventilation. Until recently, shafts were thought open and accessible enough to avoid gas buildup. Dugway Storage Tunnel (DST) shaft DST-7 was completed using a vertical boring machine (VBM). During shaft excavation, gas inflow rates exceeded the volume controllable with the VBM ventilation system and the VBM could not be advanced. Nearly thirty working days of delay occurred before gas levels dissipated enough to allow safe shaft entry and completion of the excavation. A case history of the shaft excavation with recommendations regarding dealing with gas impacts on future VBM-advanced shafts is provided.
机译:俄亥俄州隧道的气体流入克利夫兰,历史记录良好,历史地解决了通风。直到最近,轴被思想开放,足以避免气体积聚。使用垂直镗床(VBM)完成戴头储存隧道(DST)轴DST-7。在轴挖掘过程中,气体流入速率超过VBM通风系统可控的体积,VBM无法提前。在气体水平耗散足以允许安全轴入口和完成后发生近三十个延迟工作日。提供了关于处理对未来VBM-Advanced轴的煤气影响的建议的轴挖掘案例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号