首页> 外文会议>Rapid Excavation and Tunneling Conference >NEW CRYSTAL SPRINGS BYPASS (POLHEMUS) TUNNEL--DESIGN CHALLENGES
【24h】

NEW CRYSTAL SPRINGS BYPASS (POLHEMUS) TUNNEL--DESIGN CHALLENGES

机译:新水晶弹簧旁路(圆珠)隧道 - 设计挑战

获取原文

摘要

The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus) Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC's 4.3 billion dollars capital improvement program to repair and seismically upgrade their aging pipelines, tunnels, reservoirs and dams that provide drinking water to more than 2.4 million customers in the San Francisco Bay Area. This paper describes the development of the tunnel alignment and design, and the complex ground conditions of the Franciscan Melange. Of particular interest is the challenge of tunneling with a possible downhill grade of 3 percent, a rigorous environmental process and incorporating the lessons learned from 1960s construction of the adjoining Crystal Springs Bypass Tunnel.
机译:1,380米(4,200英尺)长的新型晶体弹簧旁路(Polhemus)隧道(NCSBT)将取代现有的水晶弹簧旁路管道。该隧道项目是SFPUC的43亿美元资本改进计划的一部分,以修复和地升级旧的管道,隧道,水库和水坝,为旧金山湾区的240万客户提供饮用水。本文介绍了隧道对准和设计的发展,以及Franciscan Melange的复杂地面条件。特别感兴趣的是隧道的挑战,可能的下坡等级为3%,一个严格的环境过程,并将其纳入了20世纪60年代的毗邻水晶弹簧旁路隧道的施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号