首页> 外文会议>Rapid Excavation and Tunneling Conference >ELM ROAD GENERATING STATION WATER INTAKE TUNNEL
【24h】

ELM ROAD GENERATING STATION WATER INTAKE TUNNEL

机译:榆树发电站进水隧道

获取原文

摘要

Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation. The intake tunnel system consists of a temporary mining shaft, pump house and intake channel riser shafts, and four lakebed intake shafts. An 8.33 m diameter, 2,800 m long TBM mined rock tunnel is being constructed to connect the shafts. The intakes are located 2.4 kilometers offshore in Lake Michigan. The shafts and tunnel are being constructed in glacial tills and Silurian Dolomite. The estimated tunnel completion is December 2007.
机译:Kenny / Shea JV正在为新ELM公路发电站建造一种超临界燃煤电厂的水入口隧道,该隧道是由Bechtel Power Corporation建造的威斯康星州橡树溪的超临界燃煤发电厂。进气隧道系统包括临时采矿轴,泵房和进气通道提升管,以及四个湖床摄入轴。直径为8.33米,建造了2,800米长的TBM岩石隧道以连接轴。摄入量位于密歇根湖近海2.4公里。轴和隧道正在冰川耕种和硅片白云石中构建。估计的隧道完成是2007年12月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号