EXCAVATION AND SUPPORT OF A WATER TUNNEL THROUGH THE HAYWARD FAULT ZONE

机译:水隧道通过海沃德断层区的挖掘和支撑

获取原文

摘要

The East Bay Municipal Utility District's Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This project involved the construction of a bypass tunnel through the fault zone, including an enlarged vault section designed to accommodate up to 8.5 feet of horizontal offset. Ground conditions encountered included sheared and crushed serpentinite and clayey fault gouge, and presented specific challenges for construction. A special excavation and support sequence used concrete-backfilled side drifts as foundations for the vault steel sets. It also allowed for a 20-foot-wide top heading and bench excavation in soft and squeezing ground conditions.
机译:东湾市政公用事业区的克莱蒙特隧道是一支18,000英尺长的水隧道,在加利福尼亚州奥克兰附近的海沃德断层区穿过。它最初于1929年完成。该项目涉及通过断层区域构建旁路隧道,包括扩大的Vault部分,旨在容纳高达8.5英尺的水平偏移量。遇到的地面条件包括剪切和粉碎的蛇形素和粘土故障凿孔,并为建筑提出了特定的挑战。一种特殊的挖掘和支持序列使用混凝土回填侧漂移作为拱顶钢结构的基础。它还允许在柔软和挤压地面条件下进行20英尺宽的顶部标题和板凳挖掘。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号