The Republic of Singapore's Public Utilities Board is implementing the Deep Tunnel Sewerage System Project. The project's deep tunnel component, 48 km of deep, large diameter sewer tunnels has been successfully completed (the works are in the defects liability period). Six International Design/Build tunnel contracts utilized eight Earth Pressure Balance TBMs ranging up to 7.23 m in diameter to deal with varied ground types ranging from deep soft clays to fresh granite. Numerous access/work shafts were constructed and using various support systems. This paper provides an assessment/overview of the tunnel contracts, tunnel excavation methods and equipment, and the shaft systems. Suggested enhancements to similar future projects are provided.
展开▼
机译:Litchfield心理咨询模型以哲学为基础,将精神健康服务应用程序Lift Up UP,旨在提供简单,实用的建议,以帮助个人和员工应对日常的精神健康挑战,并将用户与现有的精神健康专业人员联系起来。 Lift me UP将使用先进的技术来:•协助患者评估过程•监控和支持日常工作•将用户推荐给可用的心理健康专家•与市场上的任何产品相比,创造独特的定制体验。