The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value Engineering team proposed a single-tunnel alignment that would be less destructive on the environment and might have a lower life cycle cost than the proposed design of two tunnels connected by two pipelines on steep hillsides. A decision was made to include this option in the bid process as a design-build alternative. The bid for this option was the lowest and a contract was awarded. During the TBM excavation a segment of tunnel wall caved in containing large quantities of water saturated with extremely high levels of hydrogen sulfide (H_2S) gas (measured at 380 to 520 ppm in the air). The Central Utah Water Conservancy District (District) in consultation with Obayashi/Clyde (Contractor) quickly developed a new plan to finish the system by incorporating parts of the original tunnel/pipeline concept and re-bid the remainder of the project as a Phase 2 Design-Build contract.
机译:上部钻石叉项目,作为犹他州犹他州项目完成法案的一部分,将水从现有的第六水渡槽传达到钻石叉管道。在设计期间,价值工程团队提出了一个单隧道对准,这些对准在环境上不会产生破坏性,并且可能比在陡峭的山坡上的两个管道连接的两个隧道的建议设计更低的生命周期成本。决定在投标过程中包含此选项作为设计 - 构建替代方案。此选项的出价是最低,授予合同。在TBM挖掘过程中,隧道壁的一段腔内含有大量的水,饱和具有极高水平的硫化氢(H_2S)气体(在空气中以380至520ppm测量)。犹他州犹他州水利区(区)与Obayashi / Clyde(承包商)进行磋商,通过结合原始隧道/管道概念的部分并将项目的其余部分重新投标作为阶段2来迅速制定了新的计划。设计建立合同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号