To accommodate the new Pier A expansion at BWI airport, a 1.8 m (6.0 ft) diameter stormwater pipe was constructed below active Runway 15R-33L. The jacked tunnel alignment runs east/west below the runway, and the depth the crown was 6.1 m (20 ft). Soil conditions consisted of very loose to medium sand and gravel, with some medium stiff clay and silt. SuperJet Grouting was selected as the ground treatment system, creating large diameter columns. All work was performed from the surface of the runway between the hours of 12 am and 6 am. Monitoring points along the tunnel in the grout zone indicated zero settlement during tunneling. Tunneling operations in front of and beyond the treatment zone experienced significant settlement. SuperJet Grouting in the treatment zone provided a low permeability continuous stable soilcrete that was readily mined while the runway remained in service.
机译:为了适应BWI机场的新码头A扩张,1.8米(6.0英尺)直径的雨水管道由15R-33L的活动跑道下方构建。顶部隧道对准在跑道下方延伸/西部,冠部的深度为6.1米(20英尺)。土壤条件包括非常松散的中型沙子和砾石,一些中等粘土和淤泥。选择超级灌浆作为地面处理系统,产生大直径柱。所有工作都是从跑道的表面到12点到凌晨6点之间进行。在灌浆区中沿着隧道的监测点指示隧道期间的零结算。治疗区前面和超出治疗区前面的隧道操作经历了重要的定居点。在处理区内的超级灌浆提供了一种低渗透性连续稳定的土壤,而跑道仍在服役。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号