The design/build of two adjacent vertical mine shafts in difficult ground conditions at a mining complex in the mid-western United States required innovative construction techniques. Construction of the 267-m-deep Service Shaft required full depth dewatering wells and ground freezing. Blind drilling was utilized to excavate the 257-m-deep Production Shaft and it was finished with a steel/concrete composite liner that was floated into place. An equally unique component of the installation included supplying a high capacity vertical conveyor system, featuring a 273-m-lift. Other components of the project include the mine level development, as well as the design and installation of three hoisting systems, including a 45-ton capacity men/materials hoisting system.