NINTH LINE TRUNK SEWER-MARKHAM

机译:第九线树干下水道 - 马克姆

获取原文

摘要

The 9th Line/16th Ave tunnels are part of a 700 million dollars expansion of the York Durham Sewage System, north of Toronto. The 15 km of tunnels presented many challenges, including glacial and postglacial deposits, at depths up to 55 m. Due to high hydrostatic heads, the Owner specified EPB tunnelling, however, an alternate was proposed utilising rib and lagging tunnels, combined with a de-watering scheme. State of the art technology was utilised with a new Lovat TBM, incorporating PLC control, soft start water-cooled motors and a head designed to tackle the mixed ground expected. The 9th Line tunnels were completed in 2002. Subsequently the second section of tunnel along 16th Avenue has been awarded to the Joint Venture. This paper presents a case history of the soft ground tunnelling, including design elements, tunnel systems and TBM operations.
机译:第9行/ 16日AVE隧道是约克达勒姆污水系统,多伦多北部的7亿美元扩张的一部分。隧道15公里呈现出许多挑战,包括冰川和后玻璃沉积物,深度可达55米。由于高静水头,所有者指定了EPB隧道,但是提出了肋骨和滞后隧道的交替,与脱水方案结合。最先进的技术与新的Lovat TBM一起使用,包括PLC控制,软启动水冷电机和旨在应对混合地面的头部预期。第9行隧道于2002年完成。随后致第16大道的隧道第二部分已被授予合资企业。本文介绍了软接地隧道的案例历史,包括设计元素,隧道系统和TBM操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号