This paper discusses the process utilized by the City of Portland Oregon's Bureau of Environmental Services (BES) to procure and compensate Impregilo-SA Healy (I/H) for the West Side Willamette River Combined Sewer Overflow (CSO) Project. The contract method is a three-phase process consisting of qualifications based contractor procurement, pre-construction phase design assistance/construction planning, and facility construction where the contractor is compensated on a cost reimbursable-fixed fee basis. The paper focuses on pre-construction phase lessons learned from the development of the contract general conditions, establishment of a construction budget and cost control program, incorporation of contractor recommended design changes, and development of a subcontractor procurement program for construction.
机译:本文讨论了波特兰俄勒冈州的环境服务局(BES)所利用的过程,以采购和补偿西侧威拉米特河联合下水道溢出(CSO)项目的ImpredIno-Sa Heally(I / H)。合同方法是一项三相过程,包括基于资格的承包商采购,预施工阶段设计援助/施工规划,以及承包商以成本偿还固定费用赔偿承包商的设施施工。本文重点介绍了从合同一般条件的发展中汲取的建设前阶段经验教训,建立建设预算和成本控制方案,纳入承包商建议的设计变更,以及制定建设的分包商采购计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号