As part of the ongoing 2nd Avenue Subway program, which will relieve major congestion for subway riders on Manhattan’s east side, MTA Capital Construction (MTA CC) contracted Skanska/Traylor Joint Venture (STJV) to excavate and concrete line the station cavern for the 86th St Station. Before excavation of the cavern could begin, STJV had to drill and blast a 36' wide × 190' long open cut on the south end of the station 70' below street level which would provide the access for the cavern portal. The excavation started east of 2nd Avenue next to a high rise apartment building and finished west of 2nd avenue underneath the basement of a building STJV demolished and adjacent to two historic/fragile brownstone buildings. To complicate matters, the excavation went below 2nd Avenue, under live vehicular and pedestrian traffic plus a myriad of utilities including gas, water, sewer, electrical and communication lines. This paper will describe the means and methods employed to balance expedited drill, excavation and rock support production with minimal impact to the community and surrounding buildings. The obstacles that were overcome include the stringent vibration criteria, continuous public observation, low headroom when working with utilities, very tight surface staging, controlling environmental impacts (noise, dust, air overpressure) and safety challenges when working in one of the most densely populated and influential areas of Manhattan, the Upper East Side.
机译:作为正在进行的第二大道地铁计划的一部分,它将减轻曼哈顿东侧的地铁车手的主要拥堵,MTA基本建设(MTA CC)合同的Skanska / Traylor合资(StJV)挖掘和混凝土队的第86位车站洞穴圣站。在洞穴的挖掘之前可以开始,STJV必须在街道水平以下的车站南端钻探和爆炸并爆炸36英尺的宽×190'长开口切割,这将为洞穴门户提供进入。挖掘在第2大道旁边的高层公寓楼左右开始,在拆除两个历史/脆弱的赤石岩大厦的建筑物拆除和毗邻的建筑物下面的第二大道西部。为了复杂化问题,挖掘低于第二大道,在现场车辆和行人交通下加上无数公用事业,包括天然气,水,下水道,电气和通信线路。本文将描述用于平衡加急钻探,挖掘和岩石支撑生产的手段和方法,对社区和周围建筑物的影响最小。被克服的障碍包括严格的振动标准,在使用公用事业时,非常紧密的表面分类,控制环境影响(噪音,灰尘,空气过压)和安全挑战,在最稠密的填充中曼哈顿的有影响力的地区,上东侧。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号