首页> 外文会议>International Conference on Information Technology and Engineering Management >Minimization of Makespan Using FCFS and Gupta Method Comparison in Machine Spare Part Industry
【24h】

Minimization of Makespan Using FCFS and Gupta Method Comparison in Machine Spare Part Industry

机译:利用机器备件行业的FCF和GUPTA方法比较最小化MEPESPHAN

获取原文

摘要

Companies that produce spare parts for manufacturing industry machines are experiencing rapid development.The company produces production activities based on job orders where the process uses FCFS(First Come First Served)rules.Company scheduling often experiences delays especially on products have the same flow.The study was conducted to find the optimal sequence of scheduling with makespan minimization criteria using the Gupta Method and FCFS Method.The FCFS method used by the company produces makespan of 12.160,21 minutes = 202,67 hours.The recommendation method has a better level of performance compared to the company shown in efficiency index(EI)and relative error(RE).The EI value of the Gupta method is 1.14 which is indicates that the Gupta method has a good performance compared to the FCFS method.While the Gupta method RE value is 13,76%.The conclusion is Gupta method produces the minimum makespan value with a reduction of makespan of 178,15 hours.The Gupta method is a better method than FCFS method,which is shorter makespan,tardiness and flow time.
机译:为制造业机器生产备件的公司正在经历快速发展。该公司根据工艺使用FCF(首先第一次服务)规则的工作订单生产生产活动..常常经常在产品上经历延迟的延误。进行了研究以找到使用GUPTA方法和FCFS方法使用MakEspan最小化标准的最佳调度序列。公司使用的FCFS方法产生12.160,21分钟= 202,67小时。推荐方法具有更好的水平与效率指数(EI)中显示的公司相比的性能和相对误差(RE)。GUPTA方法的EI值为1.14,表示GUPTA方法与FCFS方法相比具有良好的性能。仿植物方法重新实现了良好的性能。价值为13,76%。结论是Gupta方法,产生最低的Mapspan价值,减少了178,15小时的Mapspan。Gupta方法更好HOD比FCFS方法,这是短的Makespan,迟到和流量时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号