Program-target approach as a basis for issuing a backlog in construction

机译:作为发布施工积压工作的基础的项目目标方法

获取原文

摘要

During the last decades, the problem of maintaining the level of the housing stock was solved by the residual principle. The low quality of housing due to the use of short-lived materials and projects not reflecting the real objects' state has led to accelerated rates of physical and moral deterioration of buildings. Implementation of the overhaul program is one of the priorities, but despite its significance, a number of problems of its implementation have been identified. The planning methods currently used do not properly reflect the changes taking place. The article proposes one of the possible solutions to the difficulties arisen, namely, the formation of a backlog on the program-target approach basis. Construction companies must diversify their backlog taking into account the existing workload and the lot structure determined by the customer.
机译:在过去的几十年里,保持住房存量水平的问题通过剩余原理得到了解决。由于使用寿命短的材料和不反映实物状态的项目,住房质量低下,导致建筑物的物理和道德恶化速度加快。实施大修计划是优先事项之一,但尽管其意义重大,但在实施过程中发现了一些问题。目前使用的规划方法不能正确反映正在发生的变化。本文针对出现的困难提出了一种可能的解决方案,即在项目目标方法的基础上形成积压。建筑公司必须考虑现有工作量和客户确定的地块结构,使积压工作多样化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号