首页> 外文会议>Hydrovision Brasil Conference and Exhibition >ESTUDOS E OTIMIZAC?ES ELETROMECANICAS PARA A EXPANS?O DA UHE COARACY NUNES (ELECTROMECHANICAL, OPMIZATIONS AND STUDIES FOR THE EXPANSION OF COARACY NUNES HYDRO POWER PLANT)(PPT)
【24h】

ESTUDOS E OTIMIZAC?ES ELETROMECANICAS PARA A EXPANS?O DA UHE COARACY NUNES (ELECTROMECHANICAL, OPMIZATIONS AND STUDIES FOR THE EXPANSION OF COARACY NUNES HYDRO POWER PLANT)(PPT)

机译:用于扩展UHE Coory Nunes的机电研究和优化型(机电,oppizations和Coorying Nunes水电站扩展的研究)(PPT)

获取原文

摘要

1. STATE OF AMAPA (AP); 2. FERREIRA GOMES CITY; 3. ARAGUARI RIVER; 4. INSTALLED CAPACITY: 78 MW; 5. 3 UNITS (KAPLAN): 5.1 2 with 24MW (repowered) 5.2 1 with 30 MW (new unit) 6. Hn = 21.9 mca (nominal net head); 7. GUARANTEED ENERGY: 63,27MWm; 8. RUN-OF-RIVER; 9. RESERVOIR: 23,1 km2 (flooded area)
机译:1. AMAPA(AP); Ferreira Gomes City; 3.阿拉圭河; 4.装机容量:78兆瓦; 5. 3个单位(Kaplan):5.1 2带24MW(重新驱动)5.2 1,30 MW(新单位)6.HN = 21.9 MCA(标称网头); 7.保证能源:63,27mwm; 8.河流; 9.水库:23,1 km2(洪水区)

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号