Research of consolidation settlement caused by shield tunnel construction

机译:盾构隧道施工造成的整合沉降研究

获取原文

摘要

The ground settlement caused by shield tunnel construction increased gradually over time. The long-term settlement caused by shield tunnel construction was divided into three stages. The stage 2 between the end of shield tunnel construction and the beginning of subway operation was emphatically analyzed. The research methods in stage 2 were summarized as follows: the predict method based on measured data, analytical solutions and finite element method, and the research progress and relative merits for each method were discussed, and the further research was also proposed. Finally, the distribution and calculation method of the soil excess pore water pressure were discussed, and the method to determine the scope of soil excess pore water pressure was put forward.
机译:盾构隧道施工引起的地面沉降随着时间的推移逐渐增加。 盾构隧道施工引起的长期沉降分为三个阶段。 重点分析了屏蔽隧道结构结束和地铁操作的开始之间的阶段2。 阶段2中的研究方法总结如下:讨论了基于测量数据,分析解决方案和有限元方法的预测方法,以及每种方法的研究进度和相对优点,还提出了进一步的研究。 最后,讨论了土壤过量孔隙水压力的分布和计算方法,并提出了确定土壤过量孔隙水压力范围的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号