首页> 外文会议>AWEA Wind Power Transmission Workshop >Midwest ISO Generator Interconnection Queue Reform - (PPT)
【24h】

Midwest ISO Generator Interconnection Queue Reform - (PPT)

机译:中西部ISO发电机互连队列改革 - (PPT)

获取原文

摘要

A robust business case for the plan: - Need to demonstrate that the hypothesized benefits exist, including evaluation of alternatives; - Regulators are the judge of the business case. Increased consensus around regional energy policy: - Does not exist today around wind, for example, across the Midwest ISO footprint. A regional tariff that matches who benefits with who pays over time: - For example, beneficiaries of wind may be due to public policy, rather than load flow or economic benefit analyses which are the current basis for cost allocation. Cost recovery mechanisms that reduce financial risk: - Investors in these projects need to be assured of cost recovery.
机译:该计划的强大商业案例: - 需要证明存在假设的益处,包括评估替代品; - 监管机构是商业案例的判断。 在区域能源政策周围增加共识: - 在风周围不存在,例如,在中西部的ISO足迹周围。 符合谁收益的区域关税:例如,风的受益者可能是由于公共政策,而不是加载流量或经济效益分析,这是当前成本分配的基础。 降低金融风险的成本恢复机制: - 这些项目中的投资者需要确保成本恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号