首页> 外文会议>International Workshop on Environmental Contamination from Uranium Production Facilities and their Remediation >REMEDIATION OF THE LOW LEVEL RADIOACTIVE WASTE TAILINGS POND IN KOWARY (POLAND)
【24h】

REMEDIATION OF THE LOW LEVEL RADIOACTIVE WASTE TAILINGS POND IN KOWARY (POLAND)

机译:在亚马里(波兰)的低级放射性废物尾矿池中的修复

获取原文

摘要

The paper presents in a condensed form the characteristics of the tailings pond in Kowary (Poland), the plan for remediation, as well as the most essential elements of the remediation technology applied. Post-remediation investigations indicated that the remediation results are consistent with planned indicators. The pond was eliminated from the surface of the land, dams were stabilized, the radiation was reduced to background level, i.e. < 300 nSv/h, the surface and groundwaters from the area of the settling tank were drained and taken outside for later treatment in the existing water treatment system. The entire area was cleaned up and — due to vegetation development — blended into the landscape.
机译:本文以浓缩的形式呈现尾矿池中的特点(波兰),修复计划,以及适用的修复技术的最基本要素。 后补救措施调查表明,修复结果与计划指标一致。 池塘被从地面消除,坝被稳定,辐射降低到背景水平,即<300 nsv / h,从沉降罐的面积的表面和地面被排出并在外面拍摄以供以后处理 现有的水处理系统。 整个区域被清理干净,而且由于植被发展 - 融入景观。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号