【24h】

Nine mile hed sedimentation study

机译:九英里铰接沉降研究

获取原文

摘要

The Nine Mile Hydroelectric Development is a 90-year old facility located on the Spokane River at Nine Mile, Washington that has been owned and operated by Washington Water Power (WWP) since 1925. The pool behind the dam has been infilling slowly with sediment over the last 90 years. Notable morphologic changes have occurred near the dam over the last 20 - 30 years, with new shoals and islands forming. Although sediment build-up in the Nine Mile forebay has been experienced over the life of the project, it has only been in the last few years that this build-up has impacted the operation of the plant.
机译:九英里水电开发是一家90岁的设施,位于华盛顿九英里的斯波坎河上,由1925年以来由华盛顿水力(WWP)拥有和运营。大坝后面的游泳池一直慢慢地用沉淀物慢慢灌注 过去90年。 在过去的20-30年里,大坝附近发生了显着的形态变化,新的浅滩和岛屿形成。 虽然在项目的生命中经历了九英里的沉积物堆积,但它只在过去几年中,这种积累了影响了植物的运作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号