首页> 外文会议>International conference on hydropower;Waterpower >Using cooperative development to supply project recreation demands
【24h】

Using cooperative development to supply project recreation demands

机译:使用合作开发来供应项目娱乐需求

获取原文

摘要

With the deregulation of the electric power industry looming just around the corner, a new, and never-so-strong, impetus for cost-cutting and saving has produced a new willingness of hydropower project owners to look for opportunities for partnerships in meeting the demands for supplying the requsite recreation opportunities at these projects in order to maintain profitability. No longer can the owners and operators of the FERC-licensed hydropower dams afford to keep outside entities out of the planning, supply, and managmenet of project-supplied recreation facilities.
机译:随着电力行业的放松围绕拐角处,新的,永不如此强大,成本削减和储蓄的推动力产生了水电项目所有者的新意愿,寻找合作伙伴关系的机会 为这些项目提供REQUSITE娱乐机会,以保持盈利能力。 不再能够在FERC-持牌水电大坝的所有者和运营商中,在项目提供的娱乐设施的规划,供应和管理管理中,不得不将外部实体纳入。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号