首页> 外文会议>International conference on hydropower;Waterpower'97 >Using cooperative development to supply project recreation demands
【24h】

Using cooperative development to supply project recreation demands

机译:利用合作开发满足项目娱乐需求

获取原文

摘要

With the deregulation of the electric power industry looming just around the corner, a new, and never-so-strong, impetus for cost-cutting and saving has produced a new willingness of hydropower project owners to look for opportunities for partnerships in meeting the demands for supplying the requsite recreation opportunities at these projects in order to maintain profitability. No longer can the owners and operators of the FERC-licensed hydropower dams afford to keep outside entities out of the planning, supply, and managmenet of project-supplied recreation facilities.
机译:随着电力行业的放松管制迫在眉睫,新的,从未如此强劲的削减成本和节省动力推动了水电项目业主寻求合作伙伴机会以满足需求的新意愿。为这些项目提供必要的休闲机会,以维持盈利能力。 FERC许可的水电站大坝的所有者和经营者再也无法承担起将外部实体排除在项目提供的娱乐设施的规划,供应和管理范围之外的负担。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号