首页> 外文会议>European Conference on Soil Mechanics and Geotechnical Engineering vol.2 >Instrumentation and interpretation of precast segmental tunnel linings in the Line 8 Madrid Metro extension 1999 -2003, Spain
【24h】

Instrumentation and interpretation of precast segmental tunnel linings in the Line 8 Madrid Metro extension 1999 -2003, Spain

机译:第8行Madrid Metro Extension第8行的预制节段隧道衬里仪器解释1999 -2003

获取原文

摘要

This paper examines the instrumentation and monitoring of the tunnel lining placed during the 3.37 km of tunnel constructed by EPBM, for the 5.86 km extension to Line 8 of Metro of Madrid. The instrumentation comprised of vibrating wire earth pressure cells and strain gauges. The analysis of the results has been undertaken using "classical" analysis techniques and recommendations are made as to which of these methods is the most appropriate for the Madrid ground conditions.
机译:本文研究了隧道衬里的仪器监测,在欧盟建造的隧道3.37千米,为马德里地铁8号延伸。 由振动线接地压力电池和应变计组成的仪器。 使用“经典”分析技术进行了对结果的分析,并提出了这些方法的建议,这些方法最适合马德里地面条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号