首页> 外文会议>European Conference on Soil Mechanics and Geotechnical Engineering vol.2; 20030825-28; Prague(CZ) >Instrumentation and interpretation of precast segmental tunnel linings in the Line 8 Madrid Metro extension 1999 -2003, Spain
【24h】

Instrumentation and interpretation of precast segmental tunnel linings in the Line 8 Madrid Metro extension 1999 -2003, Spain

机译:西班牙马德里地铁8号线延伸段中预制分段式隧道衬砌的测量和解释

获取原文
获取原文并翻译 | 示例

摘要

This paper examines the instrumentation and monitoring of the tunnel lining placed during the 3.37 km of tunnel constructed by EPBM, for the 5.86 km extension to Line 8 of Metro of Madrid. The instrumentation comprised of vibrating wire earth pressure cells and strain gauges. The analysis of the results has been undertaken using "classical" analysis techniques and recommendations are made as to which of these methods is the most appropriate for the Madrid ground conditions.
机译:本文研究了在EPBM修建的3.37公里隧道中铺设的隧道衬砌的监测和监测,以延伸至马德里地铁8号线5.86公里。该仪器包括振动线接地压力传感器和应变仪。使用“经典”分析技术对结果进行了分析,并提出了关于哪种方法最适合马德里地面条件的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号