IMPLEMENTATION AND MONITORING OF A COMBINED SEDIMENT CAPPING AND HABITAT RESTORATION PROJECT AT A MERCURY CONTAMINATED MARINE SEDIMENT SITE

机译:在汞污染海洋沉积物现场实施和监测泥浆沉积物封装和栖息地修复项目

获取原文
获取外文期刊封面目录资料

摘要

The Whatcom Waterway Site,located within inner Bellingham Bay, Washington consists of intertidal and subtidal aquatic lands within and adjacent to the Whatcom Waterway in Bellingham,Washington.Georgia-Pacific completed a Remedial Investigation/Feasibility Study(RI/FS)of the Whatcom Waterway Site in July 2000 under Washington State’s Model Toxics Control Act.This study found that the Georgia- Pacific Log Pond contained elevated concentrations of mercury,phenolic compounds, and woody debris that exceeded State cleanup levels.In cooperation with the Washington Department of Ecology and the interagency Bellingham Bay Pilot Work Group,Georgia-Pacific developed the Whatcom Waterway Log Pond Interim Remedial Action and Habitat Restoration Project,in which approximately 43,000 cubic yards of clean navigational dredge material were placed on the Log Pond sediments between November 2000 and February 2001.The final total placed thickness of the Log Pond cap ranged from 0.5 feet along the cap perimeter(e.g.,adjacent to structures)to up to 10 feet within the interior of the project area.The combined capping and habitat restoration project also improved 5.6 acres of habitat within the Log Pond.Long-term monitoring of the cap is underway,and results of Year-1 monitoring are discussed,including:1) monitoring of seepage quality at the margins of the Log Pond cap to demonstrate protection of surface water;2)Sediment monitoring within the Log Pond to demonstrate cap stability and compliance with State cleanup levels;and 3)Biological monitoring within the Log Pond area to demonstrate ecosystem restoration and the protectiveness of the cap in controlling bioaccumulation exposures.
机译:Whatcom Waterway遗址位于华盛顿内部贝林汉湾内的Wathercom Patural,华盛顿州贝林厄姆的Whatcom水道内,毗邻Whandcom Waterware,完成了Whatcom水道的补救调查/可行性研究(RI / FS)遗址2000年7月在华盛顿州的型号毒品控制法案下。该研究发现,Georgia-Pacific Log Pond含有升高的汞,酚类化合物和木质碎片,超过了国家清理水平。在与华盛顿生态学部的合作中Intergency Bellingham Bay Pilot工作组,佐治亚州 - 太平洋开发了Whatcom Waterway Log Pond临时补救行动和栖息地修复项目,其中大约43,000立方米的清洁导航疏浚物料被安置在2000年11月至2001年2月之间的日志池塘沉积物上。该最终总放置的LOG池塘盖的厚度范围从盖帽盖子0.5英尺在项目区域内部的仪表(例如,结构相邻)到高达10英尺的内部。联合封盖和栖息地修复项目在LOG池塘内还提高了5.6英亩的栖息地。呼吸器的龙期监测正在进行中,讨论了年度1监测的结果,包括:1)在日志池塘帽的边缘监测渗流质量,以证明对地表水的保护; 2)在日志池塘内的沉积物监测,以证明CAP稳定性和遵守国家清理水平3)LOG池塘区域内的生物监测,以证明生态系统修复和控制生物累积暴露的帽的保护性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号