THE DOVER NJ MGP SITE REMEDIATION RESULTS OF THE PERIMETER MONITORING PROGRAM 2000-2001

机译:Dover NJ MGP网站修复结果的周边监测计划2000-2001

获取原文

摘要

The First Phase of remediation of the Dover NJ MGP Site was completed in January 2001. An integral facet of the approximately 190 day remediation program was a perimeter monitoring network comprised of eight fixed stations. The monitoring network designed, installed, operated and maintained by TRC Environmental under contract to GPU Energy was in continuous operation at all times that remedial activities were in progress at the site. Each of the eight (8) monitoring stations was outfitted with the following types of instrumentation: a GT-640A (now Met One) particulate monitor fitted with a PM10 inlet impactor for monitoring of particulate matter < 10u in aerodynamic diameter, a TECO 580 EZ PID monitor for the measurement of Total Volatile Organics (TVOC) as PID ionizable organics, a Baseline 1030 GC/PID for monitoring of BTEX, a canister sampling system for the collection of integrated volatile organic samples for analyses employing EPA Method TO-14 and a General Metal Works High-Volume air sampler for the collection of integrated air samples for eventual PAHs analyses employing EPA Method TO-13A. During the term of the approximately 192 day program more than 197,500 PM10 and TVOC data points were collected. All data were collected as 1 minute averages and compiled as 5 minute composite averages for reporting purposes. All data points were collected as raw averages and reported on a background corrected basis. This presentation will examine the particulate data collected during the Dover MGP Site remediation. Particular attention will be focused on causative agents for the small number (approximately fifty (50)) 5 minute averages (0.025% of the 197,500 PM10 data population) that exceeded the predetermined action level of 150 ug/M3. Both on and off-site specific conditions unrelated to actual remediation activities primarily responsible for the majority of these exceedences will be presented and discussed. EPA Method TO-13A was employed for the collection of integrated or time-weighted composite samples in those instances when the PM10 background corrected concentration exceeded the 150 ug/M3 action level at any of the stations for three (3) consecutive five (5) minute intervals. It should be noted that there was not a single instance during the 192 day monitoring program whereby a TO-13A sample was triggered for collection on the basis of the PM10 exceedance criteria. Samples were collected, however, on a biweekly basis at a subset of the eight stations to augment the background or baseline data base which began prior to the active remedial activities. The results of this approximate 60 sample database will be summarized and presented. The latter will include quality control data specific to the PAHs measurements such as precision data representative of the combined sample collection and analyses scheme as determined through use of collocated field samples. Lastly, this presentation will examine “lessons learned” from the Dover perimeter monitoring program and in particular what does the program data tell us about what constitutes practical monitoring for cost-effective remediation of MGP sites in the future.
机译:Dover NJ MGP网站的第一阶段于2001年1月完成。大约190天的修复计划的一个整体方面是由八个固定站组成的周边监测网络。在合同上设计,安装,经营和维护的监控网络在GPU Energy的合同中始终持续运行,这些活动在现场进行了补救活动。八(8)个监测站中的每一个都配备了以下类型的仪器:GT-640A(现已达到一个)颗粒状监测器配有PM10入口冲击器,用于监测颗粒物质<10U,在空气动力学直径中,TECO 580 EZ PID监测监测器用于测量总挥发性有机物(TVOC)作为PID电离有机物,用于监测BTEX的基线1030 GC / PID,一种用于集成集成挥发性有机样品的罐采样系统,用于分析使用EPA方法至14和A一般金属工程高批量空气采样器,用于收集集成空气样本,以实现采用EPA方法至13A的最终PAHS分析。在大约192天的计划期间,收集了超过197,500个PM10和TVOC数据点。所有数据都被收集为1分钟平均值,并编制为报告目的的5分钟复合平均值。所有数据点都被收集为原始平均值,并在后台校正的基础上报道。该介绍将检查在DOVER MGP现场修复期间收集的颗粒状数据。特别注意将重点关注少数的致病剂(大约五十(50))5分钟平均值超过超过预定动作水平的150ug / m3的预定作用水平的5分钟平均值(0.025%。展会和讨论并讨论了与主要负责大多数这些超标的实际修复活动无关的特定特定条件,并讨论。当PM10背景校正浓度超过3(3)个连续五(5)站时,当PM10背景校正浓度超过150UG / M3动作水平时,在这些情况下采用EPA方法在这些情况下集成或计时复合样品。分钟间隔。应该注意的是,在192天监测计划期间没有单一的实例,由此在PM10的基础上触发到13A个样本的基础上。然而,在八个站的子集中每周收集样品,以增加在主动补救活动之前开始的背景或基线数据库。将概述和呈现此近似60个样本数据库的结果。后者将包括特定于PAHS测量的质量控制数据,例如通过使用并置场样本确定的组合样品收集和分析方案的精确数据。最后,本演示文稿将从Dover周长监测计划中审查“经验教训”,特别是计划数据告诉我们未来成本效益修复MGP网站的实际监测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号