THE DOVER NJ MGP SITE REMEDIATION RESULTS OF THE PERIMETER MONITORING PROGRAM 2000-2001

机译:2000-2001年蠕虫监测程序的Dover NJ MGP现场修复结果

获取原文
获取原文并翻译 | 示例

摘要

The First Phase of remediation of the Dover NJ MGP Site was completed in January 2001. Anrnintegral facet of the approximately 190 day remediation program was a perimeter monitoringrnnetwork comprised of eight fixed stations. The monitoring network designed, installed, operatedrnand maintained by TRC Environmental under contract to GPU Energy was in continuousrnoperation at all times that remedial activities were in progress at the site. Each of the eight (8)rnmonitoring stations was outfitted with the following types of instrumentation: a GT-640A (nowrnMet One) particulate monitor fitted with a PM10 inlet impactor for monitoring of particulaternmatter < 10u in aerodynamic diameter, a TECO 580 EZ PID monitor for the measurement ofrnTotal Volatile Organics (TVOC) as PID ionizable organics, a Baseline 1030 GC/PID forrnmonitoring of BTEX, a canister sampling system for the collection of integrated volatile organicrnsamples for analyses employing EPA Method TO-14 and a General Metal Works High-Volumernair sampler for the collection of integrated air samples for eventual PAHs analyses employingrnEPA Method TO-13A.rnDuring the term of the approximately 192 day program more than 197,500 PM10 and TVOCrndata points were collected. All data were collected as 1 minute averages and compiled as 5rnminute composite averages for reporting purposes. All data points were collected as rawrnaverages and reported on a background corrected basis. This presentation will examine thernparticulate data collected during the Dover MGP Site remediation. Particular attention will bernfocused on causative agents for the small number (approximately fifty (50)) 5 minute averagesrn(0.025% of the 197,500 PM10 data population) that exceeded the predetermined action level ofrn150 ug/M3. Both on and off-site specific conditions unrelated to actual remediation activitiesrnprimarily responsible for the majority of these exceedences will be presented and discussed.rnEPA Method TO-13A was employed for the collection of integrated or time-weighted compositernsamples in those instances when the PM10 background corrected concentration exceeded the 150rnug/M3 action level at any of the stations for three (3) consecutive five (5) minute intervals. Itrnshould be noted that there was not a single instance during the 192 day monitoring programrnwhereby a TO-13A sample was triggered for collection on the basis of the PM10 exceedancerncriteria. Samples were collected, however, on a biweekly basis at a subset of the eight stations tornaugment the background or baseline data base which began prior to the active remedial activities.rnThe results of this approximate 60 sample database will be summarized and presented. The latterrnwill include quality control data specific to the PAHs measurements such as precision datarnrepresentative of the combined sample collection and analyses scheme as determined through usernof collocated field samples.rnLastly, this presentation will examine “lessons learned” from the Dover perimeter monitoringrnprogram and in particular what does the program data tell us about what constitutes practicalrnmonitoring for cost-effective remediation of MGP sites in the future.
机译:Dover NJ MGP站点的第一阶段修复已于2001年1月完成。大约190天的修复计划的Anrnintegral方面是一个外围监视网络,该网络由八个固定站点组成。由TRC环境公司根据GPU Energy的合同设计,安装,操作和维护的监控网络在现场进行补救活动的所有时间一直处于连续运行状态。八(8)个监控站均配备以下类型的仪器:GT-640A(nowMet One)颗粒物监测仪,配有PM10入口撞击器,用于监测空气动力学直径小于10u的颗粒物; TECO 580 EZ PID监测仪用于测量作为PID可离子化有机物的总挥发性有机物(TVOC),用于BTEX的Baseline 1030 GC / PID监测,用于采用EPA方法TO-14进行分析的用于收集综合挥发性有机物的罐式采样系统和General Metal Works High-使用rnEPA方法TO-13A的Volumernair采样器收集最终用于PAHs分析的集成空气样本。在大约192天的计划期间,共收集了197,500个PM10和TVOCrndata点。所有数据均以1分钟平均值的形式收集,并汇总为5分钟的综合平均值,以进行报告。收集所有数据点作为原始平均值,并在背景校正的基础上进行报告。本演示将检查在Dover MGP站点修复期间收集的颗粒数据。超过(150,ug / M3的)预定活动水平的少量(约五十(50))5分钟平均值rn(197,500 PM10数据总体的0.025%)将特别引起关注。将介绍和讨论与实际补救活动无关的现场和非现场特定情况,这些情况主要是造成这些超标的主要原因。在PM10背景为背景的情况下,采用EPA方法TO-13A来收集积分或时间加权的复合样品。校正后的浓度在任何三站中连续五(5)分钟间隔超过了150rnug / M3的作用水平。应当指出的是,在192天的监测计划中没有一个实例,因此根据PM10超标标准触发了TO-13A样品的采集。但是,每两个星期在八个站点的子集中每两周收集一次样本,以对背景或基准数据库进行干预,这些数据库是在积极的补救活动之前开始的。将汇总并介绍这个大约60个样本数据库的结果。后者将包括特定于PAHs测量的质量控制数据,例如代表并置现场样品的用户确定的组合样品收集和分析方案的精度数据。最后,本演示文稿将研究从多佛尔周边监测计划中获得的“经验教训”,尤其是什么程序数据是否告诉我们未来对MGP网站进行具有成本效益的修复的实用监控。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号