首页> 外文会议>International air transportation conference >Rehabilitation of runway 18r-36L and taxiwayd at the cincinnati/northern kentucky international airport
【24h】

Rehabilitation of runway 18r-36L and taxiwayd at the cincinnati/northern kentucky international airport

机译:在辛辛那提/北肯塔基州国际机场康复18 r-36L和Taxiwayd的康复

获取原文

摘要

This paper details the pavement evaluation and operations analysis oo design and sequence rehabilitiation of Runway 18R-36L and Taxiawy D at the Cincinnati/Northern kentucky International Airport. the runway was divided into five sections for rehabilitiation and different rehabilitation designs were evaluated for each section. SIMMOD was used to model and evaluate the delay costs with the rehabilitation options. Using SIMMOD analysies it was possible to develop phasing sequences to rehabilitate the runway taxiway system while maintaining operations at near normal levels.
机译:本文详细说明了路面评估和运营分析O 以北肯塔基州国际机场的跑道18R-36L和TAXIAWY D的设计和序列康复。 跑道分为五个部分,为每个部分评估了康复和不同的康复设计。 SimMod用于模拟和评估康复选项的延迟成本。 使用SimMod分析,可以开发阶段序列,以恢复跑道滑行道系统,同时保持在近正常水平的操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号