首页> 外文会议>International Conference on Advances in Power System Control >Spinning reserve and under-frequency load shedding strategies for the interconnected China Light power system
【24h】

Spinning reserve and under-frequency load shedding strategies for the interconnected China Light power system

机译:旋转储备和频率载荷脱落策略,为互连的中国光线系统

获取原文
获取外文期刊封面目录资料

摘要

Following the interconnection of the China Light & Power (CLP) and Hongkong Electric Co. (HEC) power systems in the early 1980s, the two companies have benefited not only from the sharing of spinning reserve and interchanges of economy energy, but also from the mutual support during generation contingencies. Concerted efforts have been taken in CLP to design optimised under-frequency strategies (in terms of spinning reserve and load shedding) so as to minimise both the level of spinning reserve requirement and the amount of load shedding. Particular emphasis has been placed on taking full advantage of the interconnection operation and on enhancing both the scheme security and reliability. The author presents the various considerations given in the design of the under-frequency strategies.
机译:在20世纪80年代初的中国光和电力(CLP)和香港电器有限公司(HEC)电力系统互连之后,这两家公司不仅受益于分享纺纱储备和经济能源互换,而且来自 在一代突发期间相互支持。 CLP采取了协调一致的努力来设计优化的频率策略(在纺纱储备和负载脱落方面),以尽量减少纺纱储备需求水平和负载脱落量。 特别强调充分利用互连操作和提高方案安全性和可靠性。 作者提出了在频率不足策略设计中给出的各种考虑因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号