首页> 外文会议>IABSE (International Association for Bridge and Structutal Engineering) Symposium >Developing case studies for implementing COST TU1406 Quality Control plan procedure for typical highway bridges
【24h】

Developing case studies for implementing COST TU1406 Quality Control plan procedure for typical highway bridges

机译:为典型公路桥实施生产成本TU1406质量控制计划程序的案例研究

获取原文

摘要

An extensive work was done by COST TU1406 working groups (WG) 1,2 and 3 for preparing a guidance document for Quality Control Plan (QCP) of road bridges. WG 1, 2 and 3 reports named 'Performance Indicators for Roadway Bridges', 'Performance Goals for Roadway Bridges' and 'Establishment of a quality control plan' are already published. Based on these documents and the work done to-date, a new procedure for implementing the developed guidelines for the preparation of QCP for roadway bridges was developed by WG4 members in order to unify the method used and to validate the outcomes of the developed QCP. At the first stage, a set of common highway bridge prototypes were identified including girder, frame, arch and truss bridges. A database was created where each participating country has identified local bridges for developing of the case studies. Nine out of sixty bridges where selected for the first stage of preparing an example of QCP and the case study reports were compared with an objective to validate the outcomes. A guideline document was prepared with unified instruction on how to develop the national case study per country. The typical case study includes few stages which are defined based on the work done by WG1, 2 and 3. The stages includes data collection, element identification and grouping, defining vulnerable zones, damage processes and failure modes, selecting and evaluating performance indicators (PIs) and calculating key performance indicators (KPIs), establishing demands, creating QCP scenarios and comparing them by spider diagrams. First outcomes of the prototypes case study reports are now being updated to reflect the final version of WG3 report and together with the guidelines document will be distributed among participating countries to enable the benchmarking process for the full set of bridges representing Europe common highway bridge topologies.
机译:通过成本TU1406工作组(WG)1,2和3,为准备公路桥梁质量控制计划(QCP)的指导文件来完成广泛的工作。 WG 1,2和3报告名为“巷道桥梁绩效指标”,“道路桥梁的绩效目标”和“质量控制计划”的绩效目标已经发布。基于这些文件和迄今为止的工作,由WG4成员制定了关于制定道路桥梁QCP制定QCP的新程序,以统一使用的方法和验证发达的QCP的结果。在第一阶段,确定了一组公路桥梁原型,包括梁,框架,拱形和桁架桥。创建了一个数据库,其中每个参与国家都确定了案例研究的当地桥梁。六十桥中有九个,其中选择了QCP的一个例子的第一阶段和案例研究报告的目标进行了比较,目标是验证结果。准则文件由关于如何开发每个国家的国家案例研究的统一指导。典型案例研究包括几个阶段,该阶段基于WG1,2和3所做的工作来定义。该阶段包括数据收集,元素识别和分组,定义易受攻击的区域,损坏过程和故障模式,选择和评估性能指标(PIS )并计算关键性能指标(KPI),建立需求,创建QCP方案并通过蜘蛛图进行比较。原型案例研究报告的第一个结果正在更新,以反映WG3报告的最终版本,以及指南文件将分配参与国,为代表欧洲普通公路桥拓扑的全套桥梁提供基准进程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号