首页> 美国政府科技报告 >The Statistical Approach to Quality Control in Highway Construction. Phase II. Developing Acceptance Sampling Plans and Phase III. Trial Use of Acceptance Sampling Plans. Part B. Asphalt Construction
【24h】

The Statistical Approach to Quality Control in Highway Construction. Phase II. Developing Acceptance Sampling Plans and Phase III. Trial Use of Acceptance Sampling Plans. Part B. Asphalt Construction

机译:公路建设质量控制的统计方法。第二阶段。制定验收抽样计划和第三阶段。试用验收抽样计划。 B部分沥青结构

获取原文

摘要

Previous research indicated that present accepted bituminous pavement construction does not meet specified requirements. Also on projects researched each contractor was paid 100 percent of bid price even though there was a wide range of below specification construction between jobs. A specification developed will accept construction on the basis of the average of 5 test results per LOT for (1) nominal largest sieve, AC content, compaction thickness. Adjustment price schedules are provided for the acceptance of below standard construction. A nuclear gage correlation with densities obtained from cores is included. The report demonstrates that statistically developed specifications are the only practical way to achieve uniform construction and providing a yardstick to the project engineer for uniformily judging conformance to specified requirement. The price adjustment scheme for below standard construction should provide an incentive to the contractor to construct a good product. (BPR abstract)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号