首页> 外文会议>IFIP WG 5.7 International Conference on Advances in Production Management Systems >Workforce Assignment with a Different Skill Level for Automotive Parts Assembly Lines
【24h】

Workforce Assignment with a Different Skill Level for Automotive Parts Assembly Lines

机译:劳动力分配,具有不同技能级的汽车部件装配线

获取原文

摘要

One of the most important operational issues in an assembly line is to allocate workers to tasks (or workstations) so that their workloads can be well-balanced. We address a new workforce assignment problem in an assembly line where workers can perform all tasks but have a different skill level, which affects not only the throughput but also the number of defective products. We derive two mathematical programming models that can be used in various production environments. One is with the objective of the throughput maximization while keeping the defect rate under a given criteria and the other is for the minimization of the total rework time while achieving a given throughput. Several experiments are performed with the proposed two models by changing the number of workers and a proportion of skilled workers. We also compare the two models and provide managerial insights.
机译:装配行中最重要的操作问题之一是将工人分配给任务(或工作站),以便其工作负载可以均衡。 我们在汇编行中解决了一个新的员工分配问题,其中工人可以执行所有任务但具有不同的技能级别,这不仅影响吞吐量,还影响了缺陷的产品数量。 我们推出了两种数学编程模型,可用于各种生产环境。 一个是吞吐量最大化的目的,同时保持给定标准下的缺陷率,另一个是在实现给定吞吐量的同时最小化总返工时间。 通过改变工人数量和一部分技术工人,用提出的两种模型进行了几个实验。 我们还比较两种型号并提供管理洞察力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号