首页> 外文会议>Annual Meeting of the Institute of Nuclear Materials Management >INTERNATIONAL MNSR TRAINING CENTER IN OPERATOR TRAINING FOR MNSR HEU CORE DISCHARGE AND PACKAGING
【24h】

INTERNATIONAL MNSR TRAINING CENTER IN OPERATOR TRAINING FOR MNSR HEU CORE DISCHARGE AND PACKAGING

机译:国际MNSR培训中心培训MNSR Heu核心排放和包装

获取原文

摘要

The International MNSR Training Center (IMTC) was built in 2017 at the Ghana MNSR (GHARR-1) site for training operators from the MNSR reactors to offload the core and package the irradiated fuel for transportation. The IMTC was fully used in preparations for HEU removal from the Nigerian NIRR-1 research reactor. The training program was developed based on the experiences gained from nearly 70 international shipments including the GHARR-1 HEU core removal. The main goal of the training at IMTC for the Nigerian removal was to properly train NIRR-1 staff to independently carry out the entire loading and packaging operation in one day. Based on this training program the NIRR-1 training was carried out at the IMTC from March until August 2018 in three training campaigns plus one dry run demonstration. The HEU repatriation from Nigeria to China was successfully accomplished in December 2018. This paper presents the IMTC, the training program and training materials, and introduces the courses of the implemented training campaigns and summarizes lessons learned.
机译:国际MNSR培训中心(IMTC)于2017年,于加纳MNSR(GHARR-1)网站,用于培训来自MNSR反应堆的训练运营商,以卸下核心并将照射的燃料包装卸载运输。 IMTC充分用于从尼日利亚NIRR-1研究反应堆中拆除HEU的制剂。培训计划是根据从近70个国际货物中获得的经验制定的,包括GHARR-1 Heu核心删除。 IMTC培训的主要目标是尼日利亚拆卸的是妥善训练Nirr-1员工,在一天内独立地进行整个装载和包装操作。基于此培训计划,NIRR-1培训在IMTC于3月至2018年8月进行了三项培训竞选加上一个干运行示范。从尼日利亚到中国的Heu遣返成功完成2018年12月。本文提出了IMTC,培训计划和培训材料,并介绍了实施培训活动的课程,并总结了所吸取的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号